Holed Up

If it seems like the Koons Garage construction has slowed down a bit, apparently it has thanks to the frigid weather. According to a January 8 County construction update crews are hampered from working full tilt until temps get back up to 40º. Even still, work has been slogging along, especially the brick veneer work. Final county inspection is scheduled for end of the month.

Anyway here’s last week.

The Roof – Primer & Insulation:

Lights – Close Up (21st Rd), Looking East on 21st, & NE on Lee Hwy:

Brick Veneer – Looking East on Old Dominion:

Vent Holes Drilled For Something:

Comments are closed.

Previous Posts
Categories
Tweeter button Facebook button Reddit button Myspace button Delicious button Digg button Stumbleupon button Youtube button